Skip to main content
  • No Customs Hassles
  • Guaranteed Authenticity
  • 7-Day Free Returns
  • Direct from USA
  • Factory-Direct from China
  • Fast Delivery — FedEx & DHL
  • 100% Genuine Products
  • Duties Included in Price
Poshace
Search products, brands...Search
YWBL-WH 20pcs 450V 22uf 105 Long Leads Axial Electrolytic Polarized Capacitor Kit for Industrial Electrical
Tap to zoom
1 / 10
YWBL-WH

20pcs 450V 22uf 105 Long Leads Axial Electrolytic Polarized Capacitor Kit for Industrial Electrical

3,3993,999Save 15%

All taxes included | Tracking provided

IN STOCK

Check delivery date & COD availability for your area

Qty:
Also available onamazonAmazon.in

Secured Transaction — 256-bit SSL Encrypted Payment

100% Authentic
Free Shipping
7-Day Returns
4.5· 66 verified ratings
Read reviews

We'll notify you the moment the price drops. No spam — one email, one alert.

US Store

Authentic source

Ships to India

Free shipping

12-21 Days

With tracking

Ships direct from US suppliers for authenticity and better pricing.

Payment methods

UPIRuPayCODNetBank

About this item

  • Specification Quantity: 20pcs; Color: black; Weight: about 79g
  • Operating Voltage: DC450V; Capacity: 22uf
  • Multi Functional: This polarized capacitor is heat low leakage, low loss and low impedance.
  • Excellent Performance: electrolytic capacitors, service life of more than 3000H
  • Widely Used: Suitable for electronic applications such as game consoles, DIY projects, TVs, radios, prototypes, LCD monitors, etc. It is the best choice for electronic professionals or hobbyists.

Key details

Brand
YWBL-WH
Package weight
68 g

20pcs 450V 22uf 105 Long Leads Axial Electrolytic Polariz… — Now in India

amazon

3,999

Our Price

3,399

Save ₹60015% vs Amazon

✓ Customs & duties included  ·  ✓ Free tracked delivery  ·  ✓ Priority support

10 Years TrustRare Intl.UPI | Card | EMI
amazon.in Reviews(Trust)

Secure Checkout

1-Year Warranty

Easy Returns

Tracked Delivery

US → India delivery timeline

Tracking provided
Visual tracking reduces uncertainty around international shipping.

Dispatch

2–4 days

Transit

8–14 days

Delivery

12–21 days

Typical US→India timelines. Customs or weather can add variance. We notify proactively.

US → India delivery

Tracking provided
🇺🇸🇮🇳

Dispatch

2–4 days

Transit

8–14 days

Delivery

12–21 days

Est. delivery: calculating…

Our Partners:FedExDHL

Typical US→India timelines. Customs or weather can add variance. We notify proactively.

Free International Shipping

International delivery included.

Free International Returns

International orders supported.

Lowest Price Guaranteed

Best price across all channels.

International COD

Available on select orders.

Direct sourcing: Lower final price.

Easy returns: Hassle-free.

1 Year warranty: On international products.

Customs handling: We assist where applicable.

Tracking: End to end visibility.

GST invoices: Available.

Priority support: Faster website resolution.

Price advantage: Better than most marketplaces.

Website first, Amazon second

Best price and support on the website. Amazon is available for convenience and reviews.

Found it cheaper elsewhere?

If you find this product at a lower price anywhere in India, tell us. We'll review it before selling.

No description available.

Common Questions

Is this product genuine and authentic?
Yes. All products on Poshace are 100% authentic, sourced directly from authorized US suppliers. Every order comes with a GST invoice as proof of authenticity.
How long does delivery take to India?
Estimated delivery is 12–21 business days from the date of dispatch. We ship via FedEx and DHL with end-to-end tracking provided on every order.
Are customs duties and taxes included in the price?
Yes, completely. The price you see is the price you pay — no hidden customs fees, no surprise charges at delivery.
What is the return policy?
We offer a 7-day free return policy. If you're not satisfied, return the product within 7 days of delivery for a full refund. The item must be unused and in original packaging.

What customers say

★★★★★

Bought on PoshAce to save vs Amazon. Tracking was clear the whole way.

Ria, Bengaluru

Verified Buyer

★★★★★

Saved ₹2,400 vs Amazon India on the same model. Legit product, sealed box.

Rohan, Chennai

Verified Buyer

★★★★★

First time buying internationally. Customs and duties were included. No surprises.

Ananya, Kolkata

Verified Buyer

★★★★★

Compared 3 sites. PoshAce was ₹1,800 cheaper. Shipped and tracked as promised.

Aditya, Lucknow

Verified Buyer

★★★★★

GST invoice was ready the same day. Perfect for business expense claims.

Nisha, Bhopal

Verified Buyer

★★★★★

I've ordered 4 times now. Consistent quality and pricing every single time.

Swati, Kochi

Verified Buyer

Quick Overview

  • Specification Quantity: 20pcs; Color: black; Weight: about 79g
  • Operating Voltage: DC450V; Capacity: 22uf
  • Multi Functional: This polarized capacitor is heat low leakage, low loss and low impedance.
  • Excellent Performance: electrolytic capacitors, service life of more than 3000H
  • Widely Used: Suitable for electronic applications such as game consoles, DIY projects, TVs, radios, prototypes, LCD monitors, etc. It is the best choice for electronic professionals or hobbyists.

You might also like

More from YWBL-WH

More in Capacitors